| Date | Study or Work Product | Organization | Discipline | Work Performed | Public Availability |
|---|---|---|---|---|---|
| 2020-10-08 | Lower Reservoir Embankment Plan, Profile, and Cut/Fill Review | Kleinschmidt | Reservoirs and civil works | Old Forge Pumped Storage Preliminary Design Review — lower reservoir embankment plan and profile and cut/fill quantities. | Listed in the project record |
| 2020-10-09 | Bridge Crane Superstructure Three-Dimensional Model | Kleinschmidt | Powerhouse and hydraulic conveyance | Three-dimensional model file showing the bridge crane superstructure option at the project powerhouse. | Listed in the project record |
| 2020-08-14 | Overall Site, Penstock, Powerhouse, and Lower-Intake Concept Drawings | Kleinschmidt | Powerhouse and hydraulic conveyance | Preliminary conditions overall site plan, penstocks, powerhouse, and lower intake — three drawings. | Listed in the project record |
| 2020-11-20 | Preliminary Multi-Discipline Design Drawing Package | Kleinschmidt | Reservoirs and civil works | Preliminary two-dimensional design drawings representing approximately 30 percent design completion. | Listed in the project record |
| 2020-11-20 | Design Basis Document | Kleinschmidt | Reservoirs and civil works | Design basis report supporting the preliminary design drawings — general summary of assumptions and rationale. | Listed in the project record |
| 2020-11-11 | Penstock and Project-Feature Rendering Set | Kleinschmidt | Reservoirs and civil works | Five overview drawings — penstock, upper reservoir embankment plan and profile, upper intake plan and profile, powerhouse sections. | Listed in the project record |
| 2020-11-06 | Penstock Plan and Profile Drawing Package | Kleinschmidt | Powerhouse and hydraulic conveyance | Five drawings — overall penstock plan, overall penstock profile, typical penstock cross sections, energy dissipation structure. | Listed in the project record |
| 2020-11-19 | Preliminary Powerhouse Subsurface Exploration and Geotechnical Design Report | Haley & Aldrich | Powerhouse and hydraulic conveyance | Preliminary subsurface investigation, geotechnical evaluations, design recommendations, and construction considerations for powerhouse excavation and rock support. | Listed in the project record |
| 2020-11-08 | Intake Power and Communications Schematic | Kleinschmidt | Equipment, electrical systems, and controls | Intake power and communications schematic drawing. | Listed in the project record |
| 2020-09-03 | Upper and Lower Reservoir Power Interconnection One-Line Diagram | Kleinschmidt | Equipment, electrical systems, and controls | Lower–upper reservoir power interconnection key one-line diagram. | Listed in the project record |
| 2020-09-18 | Powerhouse Architectural, Structural, and Equipment-Layout Drawing Series | Kleinschmidt | Powerhouse and hydraulic conveyance | Fifteen drawings showing eight levels of the powerhouse with plan views, three-dimensional model renderings, vertical section views, and elevations. | Listed in the project record |
| 2020-10-09 | Powerhouse Three-Dimensional Design Model | Kleinschmidt | Powerhouse and hydraulic conveyance | Three-dimensional model of the project powerhouse allowing multiple views and slices of the current design. | Listed in the project record |
| 2020-11-20 | Updated Powerhouse Three-Dimensional Design Model | Kleinschmidt | Powerhouse and hydraulic conveyance | Updated three-dimensional model of the project powerhouse. | Listed in the project record |
| 2020-10-05 | Upper Reservoir Embankment Plan and Profile Review | Kleinschmidt | Reservoirs and civil works | Preliminary design review — upper reservoir embankment plan and profile. | Listed in the project record |
| 2022-09-12 | Crane Superstructure Model Demonstration Video | REA | Powerhouse and hydraulic conveyance | Video showing how to open and use the bridge crane powerhouse superstructure three-dimensional model. | Public summary available |
| 2022-09-12 | Powerhouse Three-Dimensional Model Demonstration Video | REA | Powerhouse and hydraulic conveyance | Video showing how to open and use the powerhouse three-dimensional models. | Public summary available |
| 2022-09-12 | Powerhouse Exterior Model Demonstration Video | REA | Powerhouse and hydraulic conveyance | Video showing how to open and use the powerhouse exterior three-dimensional model. | Public summary available |
| 2020-04-02 | Ternary Pumped-Storage Equipment Proposal and Technical Package | Voith Hydro | Equipment, electrical systems, and controls | Detailed proposal for project equipment and configuration — ternary pumped-storage units. Includes management approach, technical details, and experience. | Available through qualified diligence |
| 2014-08-29 | Ternary Pumped-Storage Technology Description | Voith Hydro | Equipment, electrical systems, and controls | Voith experience with various types of pumped-storage units and ternary unit characteristics. | Listed in the project record |
| 2019-11-22 | Ternary Unit Parameter Evaluation | Voith Hydro | Equipment, electrical systems, and controls | Variants for project equipment and configuration — ternary unit parameters. | Available through qualified diligence |
| 2018-10-02 | Runner and Controls Nexus Technical Explanation | Voith Hydro | Equipment, electrical systems, and controls | Explains the connection between Voith control systems and the runner configuration. | Available through qualified diligence |
| 2018-05-09 | Pumped-Storage Control-System Technical Description | Voith Hydro | Equipment, electrical systems, and controls | Detailed technical description of control system for powerhouse including upper and lower reservoir. | Available through qualified diligence |
| 2018-05-09 | Pumped-Storage Excitation-System Technical Description | Voith Hydro | Equipment, electrical systems, and controls | Detailed technical description of excitation system. | Available through qualified diligence |
| 2020-10-29 | Hydro-Mechanical Equipment Supply and Installation Agreement Package | Voith Hydro | Equipment, electrical systems, and controls | Supply and installation agreement including scope of work, schedule, performance guarantees, and warranty provisions. | Available through qualified diligence |
| 2020-10-29 | Control, Automation, and Protection Scope Package | Voith Hydro | Equipment, electrical systems, and controls | Scope of work for supply and installation of control, automation, and protection systems. | Available through qualified diligence |
| 2020-07-31 | Integrated Concept Review Memorandum | Kleinschmidt | Reservoirs and civil works | Review of project layout and feasibility of upper and lower reservoir to retain sufficient volume for a generation and pumping cycle. | Listed in the project record |
| 2020-07-30 | Upper Reservoir Siting and Earthwork Considerations Memorandum | Kleinschmidt | Reservoirs and civil works | Memorandum on optimizing upper reservoir location to balance cut and fill quantities. | Listed in the project record |
| 2020-06-30 | Penstock Concept Review Memorandum | Kleinschmidt | Powerhouse and hydraulic conveyance | Review of penstock layout comparing one or two penstocks. | Listed in the project record |
| 2020-04-25 | Reservoir Earthwork Cost and Liner Evaluation | Linde Corp | Project delivery and constructability | Assessment of earthwork costs for upper and lower reservoirs and unit prices for geotechnical liner. | Available through qualified diligence |
| 2022-04-04 | High-Level Project Risk Summary | Kleinschmidt | Project delivery and constructability | High-level risk summary for closed-loop pumped-storage project based on preliminary design package. | Available through qualified diligence |
| 2022-07-06 | Integrated Project Gantt Schedule | REA | Project delivery and constructability | Summary-level bar schedule showing key milestones and project finance activities. | Available through qualified diligence |
| 2022-07-29 | Integrated Critical-Path Project Schedule | REA | Project delivery and constructability | Comprehensive critical-path schedule including key milestones, project financing, permitting, pumped-storage plant, and transmission facilities. | Available through qualified diligence |
| 2020-06-15 | Preliminary Geotechnical Engineering Report | Midlantic Engineering | Geotechnical investigations | Preliminary geotechnical engineering report for Old Forge outfall site — site reconnaissance, soils and geological mapping review, and preliminary assessment of earthwork and foundation conditions. | Listed in the project record |
| 1962-01-01 | Old Forge Borehole and Conveyance System Reference Drawings | Pennsylvania Department of Mines and Mineral Industries | Water and mine pool | Old Forge Mine Drainage Project drawings — plan and profile, control manhole, miscellaneous metal details, and sections of drainage ditch. | Public document |
| 2020-10-01 | Soil Resistivity Testing Report Transmittal | Haley & Aldrich | Geotechnical investigations | Transmittal of soil resistivity testing report by Hager-Richter Geoscience — results of field soil resistivity testing at three sites. | Listed in the project record |
| 2020-11-03 | Final Preliminary Geotechnical Data Report | Haley & Aldrich | Geotechnical investigations | Final preliminary geotechnical data report presenting results of subsurface exploration program and geotechnical laboratory testing — boring locations, subsurface data, seismic refraction, packer testing, and laboratory results. | Available through qualified diligence |
| 2020-11-20 | Preliminary Geotechnical Design Report — Powerhouse | Haley & Aldrich | Geotechnical investigations | Preliminary geotechnical evaluations and design recommendations for powerhouse excavation, rock support, foundation, lateral pressures, hydrostatic uplift, and construction considerations. | Available through qualified diligence |
| 2020-11-20 | Preliminary Geotechnical Design Report — Reservoirs and Gatehouses | Haley & Aldrich | Geotechnical investigations | Preliminary geotechnical evaluations for upper and lower reservoirs and gatehouses — embankment stability, settlement, seismic screening, seepage, grouting, rock stability, and gatehouse foundations. | Available through qualified diligence |
| 2022-07-29 | PADEP Multi-Program Permit Consultation Summary | Pennsylvania Department of Environmental Protection | Regulatory and agency consultation | Confirmation of permits required for Old Forge Borehole Pumped Storage. | Listed in the project record |
| 2020-05-21 | Federal and Pennsylvania Permit Requirements Matrix | Kleinschmidt | Regulatory and agency consultation | Table showing federal, Pennsylvania, and DEP permits required by the project. | Listed in the project record |
| 2020-06-08 | Dam-Permit Pre-Application Presentation | Kleinschmidt | Regulatory and agency consultation | Presentation to PADEP for Old Forge Borehole Pumped Storage dam permit pre-application meeting. | Listed in the project record |
| 2020-09-30 | Cultural Resources Desktop Review and Sensitivity Study | RETTEW | Wetlands, streams, habitat, and cultural resources | Review to identify recorded historic properties and cultural resources within the study area. Identifies features requiring further review. | Listed in the project record |
| 2020-09-24 | Timber Rattlesnake Habitat Evaluation | RETTEW | Wetlands, streams, habitat, and cultural resources | Technical memorandum showing results of a timber rattlesnake habitat assessment. | Listed in the project record |
| 2019-05-15 | PAG-02 NPDES General Permit Coverage Approval Record | Luzerne Conservation District | Regulatory and agency consultation | NPDES General Permit approval letter for stormwater discharges. | Public document |
| 2018-08-14 | Department of the Interior and U.S. Fish and Wildlife Service Project-Footprint Review Letter | U.S. Department of the Interior | Regulatory and agency consultation | Letter addressing the project footprint and relevant environmental review context. | Public document |
| 2020-09-21 | Wetland and Stream Investigation Memorandum | RETTEW | Wetlands, streams, habitat, and cultural resources | Scope and results of wetland and stream investigation on the project site — identified streams and wetlands regulated by PADEP and USACE. | Listed in the project record |
| 2019-04-05 | Overall NPDES Erosion and Sedimentation Control Plan Set | Site Services Group | Regulatory and agency consultation | Twenty-two drawings showing erosion and sedimentation control plan maps, notes, and details. | Listed in the project record |
| 2016-12-20 | Act 2 Final Report Approval Record | PADEP | Regulatory and agency consultation | Letter confirming DEP approves final report for substances identified and remediated under Act 2. | Public document |
| 2020-06-09 | PADEP Dam-Safety Pre-Application Meeting Minutes | Kleinschmidt | Regulatory and agency consultation | Minutes of pre-application meeting between REA, Kleinschmidt, and PADEP to discuss dam-safety permitting process. | Listed in the project record |
| 2019-04-05 | NPDES Erosion and Sedimentation Control Plan Files | Site Services Group | Regulatory and agency consultation | Phase 1 NPDES erosion and sedimentation control plans for stormwater retention basins for Old Forge Borehole acid mine drainage treatment plant. | Listed in the project record |
| 2019-02-19 | Erosion and Sedimentation Control Interim Report | Site Services Group | Regulatory and agency consultation | Interim report for land development project to regrade land for construction of facilities aiding collection, treatment, and discharge of acid mine drainage from Old Forge Borehole. | Listed in the project record |
| 2019-04-05 | Post-Construction Stormwater Management Report | Site Services Group | Regulatory and agency consultation | Post-construction report for land development project — regrading, access roads, and stormwater management retention basins. | Listed in the project record |
| 2019-05-01 | Stormwater Retention Basin Plan Set | Site Services Group | Regulatory and agency consultation | Approved plans for stormwater retention basins. | Listed in the project record |
| 2019-05-15 | Luzerne Conservation District Approval Letter | Luzerne Conservation District | Regulatory and agency consultation | Letter confirming approval of coverage under PAG-2 General Permit and NPDES Permit. | Public document |
| 2019-05-15 | NPDES Permit Coverage Record | Luzerne Conservation District | Regulatory and agency consultation | Permit issued by PADEP for Old Forge Borehole treatment site regrading and stormwater management basins. | Public document |
| 2021-11-01 | Transmission Right-of-Way GIS Dataset | REA | Grid and interconnection | GIS file covering transmission circuit maps from generation to load. | Available through qualified diligence |
| 2020-10-20 | Underground Cable Design Criteria | Power Engineers | Grid and interconnection | Specified installation requirements and dimensions for duct bank, horizontal directional drilling for conduit bundle, and splice vaults. | Available through qualified diligence |
| 2020-10-20 | Underground Duct-Bank Detail | Power Engineers | Grid and interconnection | Duct bank detail drawing showing PVC conduits embedded in poured concrete for electric cable, commercial fiber optic, and system cables. | Available through qualified diligence |
| 2022-04-25 | Duct-Bank and Utility-Main Detail | JHA | Grid and interconnection | Sketch showing duct bank detail with conduits for electric cable, communications and fiber, and gas line detail. | Available through qualified diligence |
| 2020-10-20 | Horizontal Directional Drilling Bore-Spacer Detail | Power Engineers | Grid and interconnection | Details for PVC conduits for transmission circuits, communication cables, system cables, bore spacer, and casing. | Available through qualified diligence |
| 2022-08-12 | Transmission Splice-Vault and Manhole Evaluation | JHA | Grid and interconnection | Preliminary route evaluation for Old Forge to Coopers Corner — transmission mains requiring splice vaults. | Available through qualified diligence |
| 2022-04-21 | PPL Facilities-Study Scope and Schedule Update — Queue AE1-058 | PJM | Grid and interconnection | Study scope for new 230 kV interconnection switchyard on the Frackville–Siegfried 230 kV line, relay modifications, fiber optic installation, and line rebuild. | Listed in the project record |
| 2019-10-17 | PJM Facilities Study Agreement — Queue AE1-058 | PJM | Grid and interconnection | Facilities Study Agreement between REA and PJM Interconnection for AE1-058 interconnection facilities. | Listed in the project record |
| 2022-04-21 | PPL Facilities-Study Scope and Schedule Update — Queue AE1-059 | PJM | Grid and interconnection | Study scope for new 230 kV interconnection switchyard on the Stanton–Summit 230 kV line, relay modifications, fiber installation, and transformer bay work. | Listed in the project record |
| 2019-10-17 | PJM Facilities Study Agreement — Queue AE1-059 | PJM | Grid and interconnection | Facilities Study Agreement between REA and PJM Interconnection for AE1-059 interconnection facilities. | Listed in the project record |
| 2019-08-01 | PJM Generation Interconnection System Impact Study | PJM | Grid and interconnection | PJM generation impact system study for Queue AE1-059 — Stanton–Summit 230 kV line. New 230 kV switchyard with interconnection near Stanton substation. | Listed in the project record |
| 2020-05-01 | Revised PJM System Impact Study Summary | PJM | Grid and interconnection | Revised system impact study identifying additional cost and time to reconfigure the Lackawanna 500/230 kV transformer. | Listed in the project record |
| 2020-07-01 | PJM / PPL Facilities Study Report | PJM | Grid and interconnection | PJM facilities study report providing scope detail on new interconnection facilities including new 230 kV switchyard components. | Listed in the project record |
| 2022-03-22 | Two-Unit 184 MW Ternary Single-Line Diagram | Voith | Grid and interconnection | Single-line diagram for project pumped-storage operation between motor generator and 230 kV step-up transformers with ternary units. | Available through qualified diligence |
| 2020-09-18 | PPL Transmission Facility Interconnection Requirements | PPL | Grid and interconnection | PPL utility transmission facility interconnection requirements for interconnection to PPL facilities. | Listed in the project record |
| 2022-08-10 | Generator-Mode Power Chart | Voith | Grid and interconnection | Power chart for generator mode for project units. | Available through qualified diligence |
| 2018-03-08 | Old Forge Borehole Mine Pool Review | REA's | Water and mine pool | Reviewed the Old Forge Borehole discharge, mine-pool geometry, historical flow and chemistry information, mine-water resource considerations, and subsidence-related questions. | Public summary available |
| 2018-02-05 | Declaration of Intention and Supporting Project Record | REA / FERC | Regulatory and agency consultation | Submitted the Old Forge Borehole reclamation and pumped-storage concept for federal jurisdictional review. | Public document |
| 2018-05-01 | FERC Jurisdictional Determination Record | Federal Energy Regulatory Commission | Regulatory and agency consultation | Established the federal jurisdictional record applicable at that stage of development. | Public document |
| 2018-08-01 | Multi-Stakeholder Old Forge Site Visit and Field Review | REA and invited participants | Public meetings, site visits, and media | On-site review of the Borehole, project area, environmental setting, and development concept. | Listed in the project record |
| 2018-08-14 | Department of the Interior and U.S. Fish and Wildlife Service Project-Footprint Review Correspondence | U.S. Department of the Interior / U.S. Fish and Wildlife Service | Regulatory and agency consultation | Federal resource-agency review of the project footprint and relevant environmental considerations. | Public document |
| 2020-06-09 | PADEP Dam-Safety Pre-Application Meeting | PADEP / REA / Project Team | Regulatory and agency consultation | Reviewed the proposed dam and reservoir program, expected permitting pathway, engineering information, and follow-up requirements. | Listed in the project record |
| 2020-08 to 2020-11 | Geotechnical Field Investigation Program | Haley & Aldrich and subcontractors | Geotechnical investigations | Site reconnaissance, drilling, soil and rock sampling, groundwater observations, laboratory testing, downhole testing, geophysical work, and data interpretation for reservoirs, gatehouses, powerhouse, and related facilities. | Listed in the project record |
| 2020 | Twenty-Four Geotechnical Test Borings | Haley & Aldrich and drilling subcontractors | Geotechnical investigations | Advanced geotechnical borings across the project area to characterize soil, rock, groundwater, and subsurface conditions. | Listed in the project record |
| 2020 | Rock Coring and Rock-Mass Characterization | Haley & Aldrich | Geotechnical investigations | Recovered rock core and evaluated lithology, discontinuities, weathering, strength, and rock-mass conditions relevant to project structures. | Listed in the project record |
| 2020 | Soil Sampling and Laboratory Classification Testing | Haley & Aldrich / Testing Laboratories | Geotechnical investigations | Collected soil samples and performed classification and engineering-property testing for preliminary design. | Listed in the project record |
| 2020 | Rock Laboratory Strength Testing | Haley & Aldrich / Testing Laboratories | Geotechnical investigations | Tested representative rock samples to support preliminary excavation, stability, foundation, and support evaluations. | Listed in the project record |
| 2020 | Groundwater Observation-Well Installation and Monitoring | Haley & Aldrich | Geotechnical investigations | Installed and monitored groundwater observation points to establish preliminary groundwater conditions across the project area. | Listed in the project record |
| 2020 | Downhole Packer Testing | Haley & Aldrich | Geotechnical investigations | Performed downhole hydraulic testing to evaluate rock-mass permeability and inform seepage and grouting considerations. | Listed in the project record |
| 2020 | Acoustic and Optical Televiewer Surveys | Haley & Aldrich / Geophysical Subcontractor | Geotechnical investigations | Collected downhole imagery and structural-orientation data to support rock-mass characterization. | Listed in the project record |
| 2020-08-12 | Seismic Refraction Survey Report | Hager-Richter Geoscience, Inc. | Geotechnical investigations | Performed seismic-refraction surveying to evaluate subsurface velocity structure and support preliminary rock and excavation interpretations. | Listed in the project record |
| 2020-09-14 to 2020-09-15 | Field Soil Resistivity Testing | Hager-Richter Geoscience, Inc. | Geotechnical investigations | Performed field soil-resistivity measurements for electrical grounding and related design considerations. | Listed in the project record |
| 2020-09-29 | Soil Resistivity Testing Report | Hager-Richter Geoscience, Inc. | Geotechnical investigations | Documented soil-resistivity field methods, measurements, and preliminary electrical-design implications. | Listed in the project record |
| 2020-08 to 2020-09 | Aquatic Resources Field Investigation | RETTEW Associates, Inc. | Wetlands, streams, habitat, and cultural resources | Field investigation and mapping of streams, wetlands, and related aquatic resources within the study area. | Listed in the project record |
| 2020-09-21 | Wetland and Stream Investigation Memorandum | RETTEW Associates, Inc. | Wetlands, streams, habitat, and cultural resources | Documented the field investigation methods and identified aquatic-resource features for preliminary project planning. | Listed in the project record |
| 2020-09-24 | Timber Rattlesnake Habitat Evaluation Memorandum | RETTEW Associates, Inc. | Wetlands, streams, habitat, and cultural resources | Evaluated potential habitat considerations for timber rattlesnake in the project area. | Listed in the project record |
| 2020-09-30 | Cultural Resources Desktop Review and Sensitivity Study | RETTEW Associates, Inc. | Wetlands, streams, habitat, and cultural resources | Reviewed available cultural-resource information and identified preliminary sensitivity considerations for project planning. | Listed in the project record |
| 2020 | Reservoir Embankment Stability Evaluation | Haley & Aldrich / Kleinschmidt | Reservoirs and civil works | Evaluated preliminary embankment geometry, material assumptions, stability conditions, and design considerations for project reservoirs. | Listed in the project record |
| 2020 | Reservoir Settlement Evaluation | Haley & Aldrich / Kleinschmidt | Reservoirs and civil works | Evaluated preliminary settlement considerations for embankments and foundations. | Listed in the project record |
| 2020 | Reservoir Seepage and Cutoff Evaluation | Haley & Aldrich / Kleinschmidt | Reservoirs and civil works | Evaluated preliminary seepage pathways, hydraulic conductivity, cutoff and grouting concepts, and monitoring needs. | Listed in the project record |
| 2020 | Reservoir Seismic and Liquefaction Screening | Haley & Aldrich / Kleinschmidt | Reservoirs and civil works | Screened seismic loading and liquefaction-related considerations for preliminary reservoir design. | Listed in the project record |
| 2020 | Gatehouse Foundation Evaluation | Haley & Aldrich / Kleinschmidt | Reservoirs and civil works | Evaluated preliminary subsurface and foundation conditions for upper and lower gatehouse structures. | Listed in the project record |
| 2020 | Powerhouse Excavation and Rock-Support Evaluation | Haley & Aldrich / Kleinschmidt | Powerhouse and hydraulic conveyance | Evaluated preliminary excavation, rock support, lateral pressure, foundation, uplift, and instrumentation considerations for the powerhouse. | Listed in the project record |
| 2020 | Hydraulic Profile and Head-Loss Development | Kleinschmidt Associates | Powerhouse and hydraulic conveyance | Developed preliminary water-conveyance geometry, hydraulic profile, operating elevations, and head-loss considerations. | Listed in the project record |
| 2020 | Reservoir Intake and Gatehouse Hydraulic Evaluation | Kleinschmidt Associates | Reservoirs and civil works | Evaluated preliminary intake, gatehouse, conveyance, access, and operational requirements. | Listed in the project record |
| 2020 | Spillway and Reservoir Freeboard Evaluation | Kleinschmidt Associates | Reservoirs and civil works | Evaluated preliminary spillway, freeboard, water-level, and emergency-release considerations. | Listed in the project record |
| 2020 | Construction Access, Materials Handling, and Sequencing Review | Kleinschmidt Associates / Bechtel | Project delivery and constructability | Evaluated preliminary access, excavation, material reuse, site logistics, crane handling, and construction sequencing. | Available through qualified diligence |
| 2020-11-20 | Preliminary Multi-Discipline Design Package Issuance | Kleinschmidt Associates | Reservoirs and civil works | Issued coordinated civil, structural, hydraulic, architectural, mechanical, and electrical preliminary design materials. | Listed in the project record |
| 2022-04-04 | High-Level Project Risk Review | Kleinschmidt Associates | Project delivery and constructability | Summarized key technical, regulatory, commercial, schedule, and development risks for project advancement. | Available through qualified diligence |
| 2022-05-05 | Susquehanna River Basin Commission Follow-Up Consultation | SRBC / REA | Regulatory and agency consultation | Continued discussion of water quantity, water use, permitting, and follow-up information following site review. | Listed in the project record |
| 2022-05-12 | Lackawanna River Conservation Association Follow-Up on Borehole Treatment and Community Benefits | Bernie McGurl / LRCA / REA | Public meetings, site visits, and media | Documented local watershed perspectives concerning the Borehole, treatment scale, multiple AMD sources, long-term operations, residuals, and community benefits. | Listed in the project record |
| 2022-07-20 | PADEP Multi-Program PACT Consultation | PADEP / REA / Project Team | Regulatory and agency consultation | Coordinated discussion across applicable PADEP programs concerning permits, environmental reviews, and project development requirements. | Listed in the project record |
| 2022-07-29 | PADEP Multi-Program Consultation Summary | Project Team / PADEP | Regulatory and agency consultation | Documented the July 20, 2022 interprogram consultation and identified follow-up permitting and technical work. | Listed in the project record |
| 2026-05-11 | Pre-Application Document and Notice of Intent Refiling Record | Renewable Energy Aggregators | Regulatory and agency consultation | Advanced the current federal licensing record for the 184 MW, 1,840 MWh Old Forge Pumped Storage Project. | Public document |
| 2026-07-07 | Notice of Intent and Pre-Application Document Filed and Served | REA / FERC | Regulatory and agency consultation | Filed and served the current NOI and PAD for the 184 MW, 1,840 MWh project and initiated the associated public-process record. | Public document |
| 2026-08-18 | Public Filing Concerning Transmission-Corridor and Property Questions | Public commenter / FERC | Regulatory and agency consultation | Raised questions concerning possible transmission facilities, property activity, and their relationship to FERC Project No. P-15411. | Public document |
| 2026-09-02 | Public Comment Filed in P-15411 | Public commenter / FERC | Regulatory and agency consultation | Added a public comment to the current federal licensing record. | Public document |
| 2026-09-09 | Corrected Independent AC Grid and Transmission-Value Screening | Independent / REA development record | Grid and interconnection | Evaluated the effects of generation, pumping, and reactive-power settings and identified a focused utility and transmission-investment comparison. Record category: independent AC screening in REA's development record. Status: independent screening reported complete; utility validation and project-specific economic evaluation are next steps. Public record: screening summary. Supporting technical evidence: access through applicable source-data and document-access procedures. | Public summary available — see /engineering-studies#september-2026-screening |