Skip to main content

The Project in Local Voices and Visual Records

Videos, Interviews, Site Visits, and Engineering Visualizations

This page preserves the human and visual record of Old Forge: the Borehole, the Lackawanna River, site visits, field work, engineering models, public presentations, and interviews with people who understand the watershed and community.

Media will be published only after rights, date, title, participants, context, captions, transcript, and release status are verified. An appearance or interview is not an endorsement.

Featured: Bernie McGurl and the Lackawanna River

Featured: Bernie McGurl and the Lackawanna River

Bernie McGurl has spent decades working on the protection and restoration of the Lackawanna River. Project interviews, correspondence, and site discussions preserve local knowledge concerning the Old Forge Borehole, abandoned mine drainage, treatment needs, long-term operations, residuals, and community benefits. Before publication, REA will verify the recording date, location, interviewer, Mr. McGurl's organizational title at the time, rights, transcript, captions, and the exact statement approved for use. The website will not imply that an interview is a formal endorsement by Mr. McGurl or the Lackawanna River Conservation Association unless written authorization states that.

Bernie McGurl Interview — video thumbnail

Bernie McGurl Interview

Published

Feature interview concerning the Old Forge Borehole and the Lackawanna River. Mr. McGurl discusses the watershed, abandoned mine drainage, treatment needs, long-term operations, and community benefits.

Watch on YouTube

May 12, 2022 Written Commentary

In preparation

Follow-up addressing Borehole treatment, multiple AMD sources, operations, residuals, and potential community benefits. Attribution and release treatment to verify.

Engineering and Project Visualizations

Engineering Models and Renderings

3-D Project Walk-Through and Powerhouse Review — video thumbnail

3-D Project Walk-Through and Powerhouse Review

Published

Three-dimensional engineering walk-through of the Old Forge project, including the powerhouse crane superstructure, interior equipment arrangement, and exterior site context.

Watch on YouTube

Penstock and Project-Feature Renderings

In preparation

Rendering series showing preliminary project features and conveyance concepts.

Preliminary Powerhouse Three-Dimensional Model

In preparation

Engineering model supporting design coordination and equipment-layout review.

Powerhouse Three-Dimensional Model Demonstration

In preparation

Model-based visualization of the preliminary powerhouse interior and equipment arrangement.

Powerhouse Exterior Model Demonstration

In preparation

Model-based exterior and site-context visualization.

Site Visits, Field Work, and Public Presentations

Site and Field Records

Project Background and Environmental Impact — video thumbnail

Project Background and Environmental Impact

Published

Overview of the Old Forge project background, environmental context, and the relationship between the Borehole, abandoned mine drainage, and the proposed pumped-storage and water-recovery initiative.

Watch on YouTube

Old Forge Multi-Stakeholder Site Visit

In preparation

Photographs, footage, attendance record, and presentation materials to be catalogued and verified.

2020 Geotechnical Field Program

In preparation

Drilling, sampling, geophysical, and observation-well media to be catalogued from project records.

PADEP Dam-Safety Pre-Application Presentation

In preparation

Presentation and meeting record concerning preliminary dam and reservoir permitting.

SRBC Technical Site Review

In preparation

Site-review materials and follow-up correspondence to be verified before publication.

Media Standards

Media Standards

Every video card will include title, date, location, participants, duration, subject, rights status, captions, transcript, thumbnail source, related documents, and a content-status label. Concept renderings will be labeled as concepts. Historical footage will be dated. Sensitive property, cultural-resource, species, security, electrical, and route information will be redacted or withheld.